DONG Lumin, ZHANG Ping, YAO Minjuan, SHI Huadong, QI Chuang, CHENG Huamin
(1. CITIC Heavy Industries Co., Ltd., Luoyang 471039, China; 2. Luoyang Mining Machinery Engineering Design Institute Co., Ltd., Luoyang 471039, China)
Abstract: Taking the production line of slag powders with annual capacity of 600 kt in a certain company in Shanxi Province as an example, the host equipment type selection, production process design, material balance calculation, particle size distribution, optimization of production process system and requirement of adjusting for process system were analyzed. The results of production practice show that the main process parameters of slag powders production line with annual capacity of 600 kt in the company have reached the design requirements, and the system runs stably.
Keywords: slag powder; production process; vertical mill
中图分类号:TD45 文献标志码:A
文章编号:1008-5548(2015)03-0103-04
DOI:10.13732/j.issn.1008-5548.2015.03.025
收稿日期:2014-07-16, 修回日期:2014-08-14,在线出版时间:2015-06-24。
第一作者简介:董鲁闽(1982—),男,硕士,工程师,研究方向为矿渣粉磨工程设计。电话:0379-64087613,13683852725,E-mail :dlm282@163.com。